On-going projects:
- Expancion, Instrumentation & Control System Revamping of HD plant/ Bandar Emam Petrochemical Company. (Honeywell FCS)
- Emergency shut down system of Shahid Hashemi Nezhad Refinary SRU4 Project/Khangiran Refinary.
- Supervisory & control system of Shahid Hashemi Nezhad Refinary SRU4 Project/Khangiran Refinary.
- Upgrading of control system in debotthlenecking /Bandar Abbas Refinery.
- Emergency shut down system of gas compressor station Qom III/ National Iranian Gas Compony.
- Supervisory & control system of gas compressor station Qom III/ National Iranian Gas Compony.
- Commissioning of Control system for Tehran Cement Line 8 in Common with ABB/Tehran cement co.
- Preparing of PFD, P&ID and plot plan for existing units using HAZMAP technology/Abadan Oil Refinery.
|
 |
Our main references (Involved):
- Electricity, Revamping and control of Kiln Unit 1 (EPC)/ Doroud cement.
- Electricity, Revamping and control of Kiln Unit 3 (EPC)/ Doroud cement.
- Electricity, Revamping and control of raw mill unit 3 (EPC)/ Doroud cement.
- Control system engineering of Tehran cement plant line 8 in software and hardware parts including (Raw mill, Kiln feed, Kiln, Cement Mill 1, Cement Mill 2) and about (4200 I/O), in common with ABB, this project is done by IDEH engineers and supervisory of ABB Engineers at ABB office in Switzerland (control system is AC 800M)/Tehran cement.
- Generation of Cosumer Circuits and ACCs drawing of Tehran cement line 8 common with ABB.
- Amir-kabir tunnel, control system /Ministry of roads and transportation.
- Manufacture of control cabinets/Pioneer energy industries.
- Commissioning of concentration unit/Miduk copper complex.
- Liquid glucose production, Gandom-koob.
- Gas pilot plant /Mehr-izadan.
- Supervision of design, installation and commissioning of control system/Behbahan cement.
- Electricity revamping and control of cement mill, unit III (EPC) /Doroud cement.
- Electricity revamping and control of cement mill, unit II (EPC) /Doroud cement.
- Electricity, control and instrumentation of packing unit/Benvid white cement.
- Control system of the Gas burner of the cement kiln/Benvid white cement.
|
 |
Our personnel had involved in:
- Installation and commissioning of DAS system/ Razi petrochemicals.
- Commissioning of DCS system / Montazer-e-Ghaem power plant.
- Design and preparation of control system and commissioning of EMCS/ Amir-kabir petrochemicals.
- Commissioning of APU unit/Fadjr petrochemicals.
- Design, Preparing of Control System, Installation and Commissioning of Painting hall/Iran Khodro.
- Design of electricity, Control system and Instrumentation/Miduk Copper Complex.
- Detailed design of control system of the gas burner of the kiln/Benvid white cement.
- Training of Instrumentation staff in DCS/Rampco.
- Detailed design of the electricity, control system and instrumentation of the Packing Unit/Benvid White Cement
- Basic and detailed design of control system and Instrumentation of Bonyeke water transmission Station /Miduk Cooper
- Design and manufacture of control system of deaerators/Bonyekeh water transmission station
- Detail design and manufacture of control system of Gas Pilot Plant Project/Mehrizadan
- Design, installation and commissioning of electricity, control system and Instrumentation /Kuwait Cement Company
|
 |
|
|