On-going projects:

  • Expancion, Instrumentation & Control System Revamping of HD plant/ Bandar Emam Petrochemical Company. (Honeywell FCS)
  • Emergency shut down system of Shahid Hashemi Nezhad Refinary SRU4 Project/Khangiran Refinary.
  • Supervisory & control system of Shahid Hashemi Nezhad Refinary SRU4 Project/Khangiran Refinary.
  • Upgrading of control system in debotthlenecking /Bandar Abbas Refinery.
  • Emergency shut down system of gas compressor station Qom III/ National Iranian Gas Compony.
  • Supervisory & control system of gas compressor station Qom III/ National Iranian Gas Compony.
  • Commissioning of Control system for Tehran Cement Line 8 in Common with ABB/Tehran cement co.
  • Preparing of PFD, P&ID and plot plan for existing units using HAZMAP technology/Abadan Oil Refinery.
ideh

Our main references (Involved):

  • Electricity, Revamping and control of Kiln Unit 1 (EPC)/ Doroud cement.
  • Electricity, Revamping and control of Kiln Unit 3 (EPC)/ Doroud cement.
  • Electricity, Revamping and control of raw mill unit 3 (EPC)/ Doroud cement.
  • Control system engineering of Tehran cement plant line 8 in software and hardware parts including (Raw mill, Kiln feed, Kiln, Cement Mill 1, Cement Mill 2) and about (4200 I/O), in common with ABB, this project is done by IDEH engineers and supervisory of ABB Engineers at ABB office in Switzerland (control system is AC 800M)/Tehran cement.
  • Generation of Cosumer Circuits and ACCs drawing of Tehran cement line 8 common with ABB.
  • Amir-kabir tunnel, control system /Ministry of roads and transportation.
  • Manufacture of control cabinets/Pioneer energy industries.
  • Commissioning of concentration unit/Miduk copper complex.
  • Liquid glucose production, Gandom-koob.
  • Gas pilot plant /Mehr-izadan.
  • Supervision of design, installation and commissioning of control system/Behbahan cement.
  • Electricity revamping and control of cement mill, unit III (EPC) /Doroud cement.
  • Electricity revamping and control of cement mill, unit II (EPC) /Doroud cement.
  • Electricity, control and instrumentation of packing unit/Benvid white cement.
  • Control system of the Gas burner of the cement kiln/Benvid white cement.
ideh

Our personnel had involved in:

  • Installation and commissioning of DAS system/ Razi petrochemicals.
  • Commissioning of DCS system / Montazer-e-Ghaem power plant.
  • Design and preparation of control system and commissioning of EMCS/ Amir-kabir petrochemicals.
  • Commissioning of APU unit/Fadjr petrochemicals.
  • Design, Preparing of Control System, Installation and Commissioning of Painting hall/Iran Khodro.
  • Design of electricity, Control system and Instrumentation/Miduk Copper Complex.
  • Detailed design of control system of the gas burner of the kiln/Benvid white cement.
  • Training of Instrumentation staff in DCS/Rampco.
  • Detailed design of the electricity, control system and instrumentation of the Packing Unit/Benvid White Cement
  • Basic and detailed design of control system and Instrumentation of Bonyeke water transmission Station /Miduk Cooper
  • Design and manufacture of control system of deaerators/Bonyekeh water transmission station
  • Detail design and manufacture of control system of Gas Pilot Plant Project/Mehrizadan
  • Design, installation and commissioning of electricity, control system and Instrumentation /Kuwait Cement Company
ideh

© 2005 IDEH